Vacature omschrijving
BedrijfsomschrijvingNouvall Engineering Services is specialized in project support for the (petro) chemical, IT and maritime industry. We provide expertise in the field of Engineering, Project Management, Maintenance, Shutdowns, Construction and Safety.
Functieomschrijving• Maintain coordination with other discipline supervisors/superintendent working in the area to coordinate all the activities and manage related interferences.
• Make sure that all the assigned activities are carried out on time, otherwise check deficiency and refer to Construction Manager to promptly define and implement corrective actions that allow compliance with the schedule.
• Verify and discuss with Construction Manager and Field Project Engineer modification or any difference raised on the activity relevant to previous and following points and cooperate with them to issue Sketches Layout for the relevant modification, when works must be executed in different way as indicated on drawings.
• Propose any improvement solution that arises during the execution of the works and support the Field Project Engineer in answering to Subcontractor’s site queries.
• Record any modification after approval and, in cooperation with Construction Manager, inform Subcontract Administrator for contractual changing.
• Prepare and fill the Request of Work Execution (R.W.E.) form for any extra work not included in the contract or for field modification, for further approval by other functions, before the execution of the work itself, as per procedure by Subcontracting Department.
• Supported by the discipline supervisors, check by the "Manpower presence report" the quantity of Subcontractor's manpower present on site (jointly with Subcontracting Management).
• Support discipline supervisors to prepare and issue to Subcontractor the Construction and Final Punch Lists and follow up the completion of relevant outstanding works.
• Support discipline supervisors to make sure that Subcontractors follow the provisions of the approved ITP and the inspections are called timely and in according to the procedure established for the project.
• Support discipline supervisors to always ensure collaboration to QC Inspector during the execution of the related inspections.
• Support discipline supervisors identifying possible non-Conformities according to the Quality Assurance System Procedure and suggest the related Corrective Action.
Specific tasks and responsibilities
• Check in advance, in cooperation with Material Controller, if the material to be used for the erection of planned works is available and report to Area Superintendent/Construction Manager any deficiency and the information on the approximate arriving date of material.
• Make sure that the prefabricated pipes are stored in a suitable place according to the pipe class, that the covers are well installed to prevent internal damage and that they are easily identifiable.
• Ensure that the subcontractor keeps the material received from the warehouse in a suitable and tidy place and that the same is not mixed and used for other purposes than the one for which it was released unless this is explicitly authorized.
• In cooperation with project control and with the Construction Manager/Area Superintendent, define the correct pipe assembly sequences considering the priorities and the available constructability studies.
• Work with the HL supervisor and safety colleagues to ensure that lifts are conducted in accordance with the method statement and that all prescribed lift precautions are followed.
• Collaborate with the instrument supervisor for the preparation of the lines and the installation/removal of the instruments during the various phases of the construction up to the tests and correctly record the various steps in the punch lists according to the provisions of the project procedures.
• Check equipment condition on arrival at site.
• Check that all machineries are protected and supervise the routine maintenance in accordance with Project procedure and Vendor's instruction, during erection period. Record of maintenance shall be prepared and filed to assure that the equipment is properly protected and maintained.
• Check the disassembly of equipment accessories before installation.
• Issue work order to Subcontractor to install equipment.
• Supervise the assembly of equipment.
• Check the paralleling of the flange connection with the pipelines and the efficiency of piping support to avoid damage to the equipment.
• Supervise and check the lubrication and auxiliary system of equipment in accordance with Vendor's Instructions.
• Keep record of modifications and send to Material Controller information necessary to issue a back charge to equipment Vendor's if necessary.
• Prepare and fill the testing and obtain approval of installation from Client.
• Check spare part delivery and correct transfer to Client warehouse.
• Take care of the protection and maintenance of equipment delivered but not immediate erected and preserved in the construction warehouse, according to Vendor and cleints regulations and procedures. Record of maintenance shall be prepared and filed to assure that the equipment is properly protected and maintained.
Functie-eisen• Proven interpersonal skills.
• Strong Computer literacy (Word, Excel, Autocad, Naviswork etc).
• Demonstrates accuracy and thoroughness.
• Works with integrity and ethically. Upholds organizational values.
• Fluent written and spoken English.
Education and Experience Requirements:
• Have solid background of covered discipline.
• Have a minimum of 10 years of experience in management of construction site.
• Be in possession of VCA-vol certification
Arbeidsvoorwaarden<a href=https://www.nouvall.com/en/find-a-job/what-we-offer/ target="_blank">What do we <b>Offer</b>.</a>
SollicitatieprocedureApply via our website www.nouvall.com and discover the possibilities.